Home owner buy the materials, Hands-On Enterprises, LLC
Only charge for the installation labor
Photo Albums for Hands-On Enterprises, LLC
Complete Roof replacement
We remove 2 layers of shingles, We install new Lifetime GAF Timberline High Definition HDZ, Color: Hickory
GAF Timberline HDZ High
Complete removal of the old roofing system, Install new GAF Timberline HDZ High Definition Life Time Shingles, This customer, buy the Weather Stopper System Plus Warranty this covers 100% of material defects for as long as 50 YRS. It also covers 100% of installation labor costs for the lifespan of the roof.
New Roofing System
Removal of the old roofing system and Install new OwensCorning Duration Sure Nail roofing system.
New Roofing System
We remove 3 layers of shingles and in some areas, it was 4 layers of shingles, we Re-Deck All the roof except an area where another contractor did a repair, On that same area we had to remove the new shingles to do a repair, we did remove 4 rotten OSB sheets by the valley area and 4 layers of valley metal, the reason we did this repair was a pour labor installation, at the end wi completely did a full new roof system on main house building only.
Removing Garage door
Remove a garage door, frame it, Install Insulation on interior of the building, Install new Drywall, Mudding, Finishing and painted. at
China 1 Restaurant. 821 W Fond du lac St, Ripon Wi. 54971
Siding on a comercial Bui
Remove and install new Siding System.
821 W Fond du lac St Ripon Wi 54971
New Roofing sistem
Remove& Install new GAF roofing system at 821 W Fond du lac St, Ripon Wi. 54971 China ! Restaurant in Ripon Wi
Roof Replacement
This photo was taken in 2009 reason for replacement of shingle: buckling shingles occur when hot air from an attic forces the shingles to buckle away from the home and a few spots of curling shingles. Hot air from an attic forces the shingles to curl away from the home. Shingles where removed and install new shingles, we also install ridge vent and checks soffits to have plenty of air flow.
Beaver Dam Top Quality Material
This customer wanted top quality material and that gave me the opportunity to give 10 years warranty on labor, because of the performance roof wrap with ice and water.
Hands-On Enterprises, LLC
Hands-On Enterprises, LLC, These are the work we do for the customer.
Oshkosh
On this building we remove existing shingles 2 layers 2020sq, apply ice and water on eves, apply felt paper, gutter apron and drip edge metal, apply cap and vents. We cleaned up around building and install new shingles. Over 8 people worked and finished in 4 days, very good work owner was satisfied.
Roof in Ripon
More pitchers of home in Ripon when it was finished 8 /12 pitch 4 layer plus shedder shake 20sq all roof and garage needed OSB plus some carpentry work. Amount of people working was only 4, finished in 3 days shingle type architecture shingle.
Ripon
8 /12 pitch, 4 layer plus shedder shake 20sq all roof and garage needed OSB plus some carpentry work. Amount of people working was only 4. Finished in 3 days, shingle type architecture shingle.